BHP-Port-headland--Pilling-For-Concrete-footing-size-reduction

BHP Port Headland

Pilling For Concrete footing size reduction

Brown's-Range-Camp-Installation

Brown’s Range

Camp Installation

Onslow-Wheatstone-Tie-down-Foundations

Onslow Wheatstone

Tie-down Foundations

Project-Four

Yongah Hill Detention Centre

Northam
2-5 meter piles installed along the sloping ground. Even after encountering the water table during installation the steel screwpiles were able to still achieve there job. With core filling and cross-bracing we were able to achieve heights of up to 3m out of the ground to support the structure.

Project-Three

BHP Rail line Pre-Drills

Port Headland
Our versatile DTH hammer drill pre drilling holes at 6” up to 12” throughout the 60km of remote terrain. Production of up to 200 holes per shift was achieved

Project-Two

BHP MOF

Port Headland
4-8m Screwpiles installed as concrete reduction method in the footings. Loads of 70 ton-150 ton were achieved using our Piling methods

Project One

15mw Solar Farm

Valdora
4m screw piles installed at rates of 250+ Per Rig per shift.